Remediation of Berhida Industrial park
MAIN TECHNICAL PARAMETERS //
Toxic metal contaminated subsoil removal: 36,700 tonna In situ deposition 36 100 tonna Construction of remediation system: 4 065 lm drainage ditch, 800 m³ drainage block Water clearing and drain system: gravel drain 2 685 lm , gravel block 4 500 m³ Monitoring well system: 20 pcs Maintenace and operation of water purification and drainage system
EMPLOYER //
Magyar Nemzeti Vagyonkezelő Zrt.
CONSTRUCTION VALUE //
4 849 000 000 HUF
YEAR //
2013 – 2015
SCOPE OF WORK //
Technical supervision service of the construction works